What authority does the project manager have?

A project manager may be appointed for feasibility, a tender process, construction or the full programme. Set out the tasks and the authority attached to them. Can the person instruct a change or certify a payment, or must they first obtain the client’s decision? Put those answers in the appointment rather than leaving them to emerge at the first disputed instruction.

The programme should show milestones and the information or client decisions needed to reach them. Cost reporting then needs to distinguish money already committed from approved changes, forecast changes and risk allowances. For decisions awaiting approval, a short log can name the question, recommendation, decision-maker and required date.

Illustration of plans, a timeline sheet, hard hat and material samples
Illustration of an unfinished office with glazed rooms and exposed services.

Understand the employer's agent appointment

In a design-and-build arrangement, an employer's agent may administer functions assigned under the contract on the employer's behalf. Check the actual contract and appointment for the powers and obligations involved. Do not assume every project manager is an employer's agent, or that an appointment includes design checking and continuous site inspection.

Confirm who advises the client on the employer’s requirements and contractor’s proposals, how discrepancies are resolved and who records the agreed baseline. The appointment should explain how instructions, payment recommendations and other contractual actions are issued under the selected contract.

Keep statutory duties visible

For projects in Great Britain, HSE describes the principal designer's CDM 2015 role as leading pre-construction health-and-safety coordination where more than one contractor is involved or is likely to be involved. That role is different from an ordinary commercial project-management appointment. In England, building regulations also establish principal designer and principal contractor duties, with competence requirements distinct from CDM. A team may hold more than one role only where properly appointed and competent for it.

Write a responsibility matrix identifying the client, designers, contractors and relevant specialists. Discuss who provides existing-building information and who coordinates its use. Avoid a blanket phrase such as “the project manager handles compliance”, which can obscure responsibilities that remain with other parties.

Run meetings around exceptions and decisions

Before each meeting, issue the current programme, change list, unresolved design queries and actions requiring decisions. Distinguish a report of progress from evidence of completion. If a package is described as complete, establish whether installation, testing, records and defects have all been addressed.

Use consistent references between the drawing register, request for information, change instruction and cost item. For example, a proposed reception change may affect joinery, lighting, data and the opening date. One coordinated change record should capture these consequences before the client approves it. Otherwise several small instructions can create an unrecognised larger commitment.

Plan site observation and quality records

Set out who inspects each part of the work and when they need to see it. Concealed installations require particular attention: a visiting adviser can only report on what is available to inspect. Agree hold points and obtain the specified records from the responsible contractor or specialist. Link each finding to the requirement and the action that closes it.

During refurbishment, allow a clear route for discovered conditions. The person finding an issue should know whom to notify and which work must wait for a decision. Give uncertainties a route to resolution without assuming that every new finding justifies an immediate instruction.

Complete the appointment through handover

Before handover, reconcile tests and operating documents with training, warranties and defects still open. Agree when the operator takes responsibility for each area and how later issues will be reported. The final management report should state any continuing contractual obligations and who is responsible for them.

Frequently asked questions

Does appointing a project manager remove the client’s duties?
No. The appointment can organise and support the client’s work, but responsibilities must be assessed under the applicable contracts and law. Specify delegated tasks and decisions retained by the client.
Is the employer’s agent responsible for every design error?
The employer’s agent’s obligations follow the contract and appointment. Check whether it has a design-review duty, and identify the designers responsible for the work and the procedure for resolving discrepancies.
Can one organisation hold project-management and principal-designer roles?
Potentially, where the relevant appointments and competence requirements are satisfied. Each role must be explicitly defined; holding one title does not automatically confer the others.

Sources

  1. HSE: the principal designer role under CDM
  2. GOV.UK: design and building work duties in England

Let's talk about your next project.

We are with you from first idea to handover.

Get in touch